Leave Your Message
list_banner

Service

Customized Solution Steps

image001

Step 1: Confirming Machine Specifications (3–7 Days)

We start by understanding the material you need to cut, its dimensions, and your specific cutting requirements. Our engineers then propose the optimal cutting solution tailored to your needs.

image003

Step 2: Mechanical Design (3–7 Days)

After finalizing your requirements, 8 WATER TECHNOLOGY engineers design the appropriate wire-cutting equipment. This step may exclude standardized models, focusing instead on your unique operational demands.

image005-removebg-preview-(1)_03

Step 3: Production (20–30 Days)

Once we receive prepayment, we begin production. The exact delivery schedule can vary depending on whether you choose a standard machine or a fully customized model.

image007

Step 4: Transportation (15–40 Days)

You can select from several shipping methods:
• Air Freight (10–15 Days): Fast but more expensive—ideal for urgent orders.
• Sea or Train (20–40 Days): More economical, best for non-urgent, larger shipments.
image009-removebg-preview

Step 5: Installation and Debugging (Not Required)

We ship the machine as a complete unit, with all parts installed and tested beforehand—no on-site assembly required. Simply plug in and begin operation. If needed, we can also arrange for our engineering team to assist with setup and training.

Service and Support

question-mark-icon-solving-problem-solution-concept
01

Service Tenet

Our unwavering goal is to offer top - tier service, always aiming to exceed customer expectations.

Service Concepts

Customer - Centered: Your needs drive every decision we make.
Service & Marketing: Exceptional service is our best marketing tool.
All - Around Support: Available whenever and however you need us.
Full Team Involvement: Everyone pitches in for seamless service.
Fast & Efficient: Swiftly resolving issues to save your time.

Product - Related Services 

image001
01

Rework/On - Site

Free service to fix any product glitches. 
image003
01

Installation & Commissioning

Complimentary during the warranty period.
image005
01

Inspection

Free checks to ensure product reliability.
image007
01

National Hotline

Reach us easily at (852)6229 0657.
image009
01

Remote Support

Free remote assistance for quick problem - solving.

Pre-sales Consultation

  • Multi-line cutting machine

    +
    *This document is applicable for the application form designed for rapid demand matching and confirmation of non - standard machinery.
    *Please fill in your requirements in the following table for reference only.

    ITEM

    PARAMETER

    REMARK

    1)

    PRODUCT MATERIAL

    For example, single - crystal silicon, polycrystalline silicon, ceramics, sapphire, etc.

    2)

    PRODUCT DIMENSION

    This dimension pertains to the material prior to cutting (Length × Width × Height)

    3)

    PRODUCT DIMENSION

    This dimension refers to the material after cutting (Length × Width × Height)

    4)

    INGOT SHAPE

    The shape of the raw material, such as cylinder, cuboid, or others

    5)

    PRODUCT THICKNESS

    The thickness of mass - produced pieces (in micrometers)

    6)

    CUTTING METHOD

    Diamond wire saw or slurry cutting (Applicable for cutting surfaces with high - quality requirements, like monocrystalline silicon semiconductor materials demanding a finer surface finish, which can reduce polishing and grinding processes)

    7)

    HANDLING METHOD

    Is it feasible to simply boil the material after cutting in boiling water to remove the adhesive?

    8)

    WARPAGE

    The required tolerance range for warpage

    9)

    CURVATURE

    The degree of bending after the cutting process is completed

    10)

    TOPOGRAPHY

    Requirements for the surface after cutting

    11)

    PRODUCT USAGE AND APPLICATION SCENARIO

    What field or specific production process will you mainly use this product for?

    12)

    BUDGET RANGE

    What is your approximate budget for this product?

    13)

    COMPATIBILITY WITH EXISTING EQUIPMENT

    Does your product need to be used in conjunction with specific equipment? Can you provide us with relevant information about your existing equipment?

    14)

    ENVIRONMENTAL REQUIREMENTS

    Do you have specific requirements for the environmental performance of the product, such as whether it needs to meet relevant environmental protection standards?

  • Cleaning machine

    +

    Category

    Specific Questions

    Cleaning Object

    What are the main workpieces or products to be cleaned? What are their materials, shapes, dimensions, and weights?

    Dirt/Soil Condition

    What type of contaminants or dirt is present on the workpieces? How strongly is the dirt adhered?

    Cleaning Volume and Cleanliness

    What is the estimated cleaning volume (i.e., the size of the cleaning batch)? What cleanliness standard should be achieved after cleaning?

    Installation Space

    What are the available dimensions (length, width, height) for installing the cleaning machine?

    Utilities Supply (Water, Electricity, Compressed Air)

    What are the on-site electrical specifications (voltage and current) and water parameters (pressure and flow rate)? What are the pressure and flow rate specifications for compressed air?

    Cleaning Process

    Is there an existing cleaning procedure? Is it necessary to add cleaning agents, and if so, what type is required? Is a multi-station cleaning function required, and if so, how many stations?

    Drying Method

    Are there any special requirements for the drying process after cleaning? Do the workpieces have any temperature sensitivity or special requirements?

    Level of Automation

    Should the cleaning machine be manual, semi-automatic, or fully automated? Is remote monitoring or data logging functionality needed?

    Budget

    What is the budget range for this industrial cleaning machine purchase?

    Customization Requirements

    Are there any special customization needs (e.g., in terms of appearance or functional design)?

    Past Experience

    What issues or challenges have been encountered with industrial cleaning machines in the past?

  • Automatic loading and unloading

    +
    Category

    Specific Questions

    Customer Basics

    Full company name, registered address? Information of the main person in charge?

    Kiln Parameters

    External dimensions, internal effective space, operating temperature, heating method, heating and cooling rates?

    Graphite Billet Situation

    Shape, dimensions, weight, material?

    Production Planning

    Production per hour, per day, per month, production fluctuations and future growth plans?

    Existing Equipment

    Details of existing equipment and current automation status, automation levels in handling, transportation, and process connection?

    Supporting Equipment

    Planned supporting equipment and related requirements, expectations for connection with loading and unloading equipment?

    Automation Expectations

    Overall automation level, special functions and connection methods in handling, transportation, and between processes?

    Processing Technology

    Complete processing flow, special process requirements, material transfer methods and storage needs?

    Budget and Procurement

    Procurement budget, start time, delivery and acceptance time nodes?

    Special Requirements

    Customization requirements, integration requirements with management systems, expectations for operation and maintenance convenience, past experience in purchasing non - standard equipment and improvement expectations?

  • SI System Integration

    +
    Category Specific Questions
    Basic Customer Information Company Name
    Basic Customer Information Company's Registered Address (Please indicate the country/region)
    Basic Customer Information Main Operating Regions (Please list if there are multiple)
    Basic Customer Information Contact Person's Name
    Basic Customer Information Contact Person's Position
    Basic Customer Information Contact Telephone Number (Please indicate the country code)
    Basic Customer Information E-mail Address
    Basic Customer Information Commonly Used Communication Language
    Project Background Project Name
    Project Background Does the project involve business integration across multiple countries or regions?
    Business Status What are the main business systems currently in use, and what functions does each system undertake (including their usage in different regions)?
    Project Expectations What specific goals do you expect to achieve through this system integration and automation project, such as improving production efficiency, reducing labor costs, etc.? Please rank them by importance
    Project Expectations What kind of expectations do you have for the degree of automation of the new system, such as full - process automation or partial - link automation?
    Technical Preferences Do you have a preference for a specific technical architecture, development language, or database?
    Technical Preferences Are there any existing technical facilities or software that must be compatible (including special systems used in different regions)?
    Technical Preferences What requirements do you have for the stability and performance of the system in different network environments (cross - border networks)?
    Budget and Time What is the approximate budget range of the project (Please indicate the currency)?
    Budget and Time Estimated project start time (Considering the impact of time differences in different regions)
    Budget and Time Expected project completion time node (Are there phased delivery requirements)?
    Regulations and Compliance Which countries or regions' regulations and compliance requirements does the project involve (such as data protection laws, industry regulatory regulations, etc.)?
    Regulations and Compliance Are there any specific security standards or certification requirements (internationally recognized or region - specific)?
    Others Do you have any other special requirements or concerns (such as the impact of cultural differences on system usage)?